Program control

Quality files move with the cell.

A dedicated route for design review, FAT evidence, packing proof and repeat-program control.

Design input

Part drawings, variants, takt assumptions and site interfaces are recorded before layout approval.

Sample and FAT

Cycle time, alarms, recovery and safety functions are checked against an agreed acceptance sheet.

Export handoff

Backups, drawings, manuals, crate records and spare lists stay tied to the approved revision.

Evidence buyers can inspect

Layout and interface schedule

FAT checklist and result file

Packing photos and crate list

Program backup and spare BOM