Buyer guide
Packing proof and inspection files for robot cells
2026-04-12

Keep disassembly, packing and installation evidence connected to the FAT-approved cell.
Key takeaways
- Robot cells often ship as several crates. Packing proof should show which approved assembly entered each crate and how it returns to its installation position.
- Include crate lists, moisture protection, lifting points, cable labels, datum marks and photos before closure.
- Keep crate numbers in the same project file as the FAT report and open-item list so site teams can trace missing or damaged parts quickly.
Robot cells often ship as several crates. Packing proof should show which approved assembly entered each crate and how it returns to its installation position.
Useful records
Include crate lists, moisture protection, lifting points, cable labels, datum marks and photos before closure.
Inspection continuity
Keep crate numbers in the same project file as the FAT report and open-item list so site teams can trace missing or damaged parts quickly.