AIDA.YUN ROBOTICS
Teach Pendant Control Cabinet
A documented control package for robot, tooling, safety and line interfaces.
Key takeaways
- Component schedule agreed before build
- Wire and terminal labels in English
- Program backup included in handoff
Lead time · 6-9 weeks
Specifications
| Voltage | Configured by destination |
|---|---|
| Safety | Safety PLC or relay |
| Network | Industrial Ethernet options |
| Documents | Electrical drawing and I/O list |
Product detail
The cabinet package keeps electrical drawings, I/O schedules, backups and replacement references aligned.
